Writing Effective PM Tasks

The most common PM checklist failure: vague task descriptions that technicians cannot execute consistently. Compare:

Poor task (ineffective)Good task (effective)
"Check motor bearings""Measure bearing housing temperature with contact thermometer at DE and NDE bearing locations. Record in °C. Alert limit: >80°C or >40°C above ambient"
"Inspect coupling""Inspect coupling element for cracks, hardening, or uneven wear. Replace if element shows surface cracking, hardness rating <Shore A 50, or element thickness reduced by >20%"
"Check oil level""Check gearbox oil level via sight glass. Top up to mid-level mark with ISO VG 220 mineral gear oil (same as in use). Record level: Low/OK/High"
"Grease bearing""Apply 9 g (approx. 3 pumps standard gun) of Mobilith SHC 460 grease to bearing housing via zerk fitting. Run machine; confirm no temperature rise above pre-grease baseline within 30 min"

Setting PM Frequency

PM task frequency should be set based on the P-F interval of the failure mode — the time between when a potential failure becomes detectable and when it becomes a functional failure. The task frequency should be less than half the P-F interval to ensure detection before failure:

Failure modeDetection method (P)Typical P-F intervalRecommended task frequency
Belt wear and crackingVisual inspection — cracking, fraying, glazing1–3 monthsMonthly visual inspection
Coupling element deteriorationVisual inspection3–12 monthsQuarterly inspection
Gearbox oil degradationOil analysis (viscosity, TAN, wear metals)3–6 monthsOil sample every 3 months
Motor insulation degradationIR test (megger test)YearsAnnual insulation resistance test
Pump impeller wearPerformance measurement (flow vs head)3–12 monthsQuarterly performance check
Filter blockagePressure differential measurementDays to weeksWeekly or monthly ΔP check

Electric Motor PM Template

TaskFrequencyAcceptance criterion
Visual inspection — general condition, cleanliness, terminal boxMonthlyNo dirt build-up on fins; terminal box sealed; no oil leaks at shaft seals
Bearing temperature measurement (DE and NDE)Monthly<80°C absolute or <40°C above ambient temperature
Vibration measurement (overall mm/s RMS at DE and NDE)Monthly or quarterlyISO 10816 Zone B for machine power class
Insulation resistance test (Megger 500V or 1kV)Annually or after wet conditions>100 MΩ (new); >1 MΩ (acceptable in service); polarisation index PI >2.0
Bearing regreasing (if grease-lubricated, regreaseable type)Per calculated interval (typically 3–12 months)Correct grease type, correct quantity (per formula); no temp rise after greasing
Coupling inspection and alignment checkAnnuallyParallel alignment <0.05 mm; angular alignment <0.05 mm per 100 mm; coupling element in good condition
Winding resistance measurement (3-phase balance)Annually or after repair±2% maximum imbalance between phases

Centrifugal Pump PM Template

TaskFrequencyAcceptance criterion
Visual inspection — leaks from mechanical seal or gland, bearing housing, couplingsWeeklyNo seal leakage beyond acceptable drip rate (gland: 1–3 drops/min acceptable; mechanical seal: zero); no bearing housing oil leaks
Bearing housing oil level checkWeeklyMid-level in sight glass
Bearing temperature measurementMonthly<70°C bearing housing; <30°C above oil temperature
Vibration measurement (overall, all three axes)Monthly or quarterlyISO 10816-7: B/C boundary per pump class
Performance check: measure flow and pressure, compare to pump curve BEPQuarterlyFlow within ±10% of design point; pressure head within ±5%
Bearing housing oil changeAnnually or per oil analysisISO VG 68 or 100 per OEM spec; clean oil, correct level
Mechanical seal inspection (visual and performance)AnnuallyNo leakage; no face wear visible; flush pipe clear

CMMS Integration

PM checklists are only effective if they are executed, recorded, and reviewed. CMMS (Computerised Maintenance Management System) integration requirements:

  • Each task generates a work order automatically at the correct interval — calendar-based or meter-based (hours/starts)
  • Measured values are recorded in the work order (not just Yes/No ticks) — enables trending of bearing temperatures, vibration levels, oil levels over time
  • Exception flags: task acceptance criteria are coded as pass/fail thresholds — CMMS generates a corrective work order automatically if a threshold is exceeded
  • Compliance tracking: PM compliance rate (% of PMs completed on time) should target >95% for critical assets — tracked as a KPI
  • Feedback loop: corrective work orders arising from PM inspections are linked to the originating PM work order — this data drives PM content improvement over time